On a recent trip to Eastleigh with my son we went via Gillingham Station (Dorset) and spotted this concrete footbridge and I thought it would be an ideal design to add to my collection of items.
The design is make up of multiple sections that can be glued together to complete the bridge, you can either build it as a U shape or can put together in a Z shape. Smoke deflectors are optional extra if you want them.
The middle span comes in three sizes of 125mm, 150mm and 175mm, this is ideal for single or double track and dependant on space you have. The design is also designed to sit on the platform.
6 Parts
Centre Arch
Steps
Support legs
Usually Dispatched within 7 Working Days by RM48
1. Does the product come with supports still attached: Yes